The setup block is on the sheet. Your initial is missing. You set down your 5/32 hex key on the edge of the Traveler Desk, wiping cutting fluid residue off your glove with a shop towel before you lean in to scan the block line by line. The CNC mill runs idle behind you, its spindle locked out per shop protocol for unapproved setups, so you don’t have to rush through your check before adding your mark.
Fixture alignment confirmation lines
The setup block includes four pre-filled checkboxes for core fixture measurements, all signed off by the night shift setup tech who prepped the station before you arrived. You cross-reference the logged tram measurement of 0.0002 inches per foot against the digital level you keep in your apron pocket, running the level across the vice jaw twice to confirm the reading matches what’s logged. You then check the vice jaw parallelism with a 6 inch parallel bar, sliding it along the full length of the jaw to confirm no gaps larger than 0.0005 inches appear between the bar and the jaw surface. You test the stop pin location by sliding a test blank into the vice, pushing it flush against the pin, and measuring the distance from the pin to the jaw edge to match the logged 1.2 inch measurement. Finally, you torque each of the four fixture plate bolts to 25 foot-pounds to confirm they are tightened to spec, and mark a small check in the margin next to each line item to note your confirmation.

Tool offset entry cross-check
Four tools are loaded into the mill carousel for this lot: a #2 center drill for spot holes, a 1/4 inch high-speed steel drill for through holes, a 3/8 inch carbide end mill for profile cuts, and a 45-degree chamfer tool for edge breaks. Each has a logged Z offset value written in the setup block, matched to the etched tool number on each holder. You pull the contact tool setter out of its storage slot on the mill stand, running each tool through the setter one by one to confirm the Z offset matches the value written. Illustrative example: For the 3/8 inch carbide end mill, the logged offset is 4.2187 inches, and your check returns an identical reading, so you note that match next to the entry. All four tools return offset values within 0.0001 inches of the logged numbers, so you mark that check complete in the margin.
Material blank dimension verification
This lot uses 6061 aluminum blanks cut to 4x6x1 inch stock, per the spec noted in the setup block, with an allowed tolerance of ±0.005 inches for all uncut dimensions. You pull four blanks at random from the stack of 12 next to the mill, measuring each with a set of calibrated digital calipers to confirm they fall within tolerance. You log your readings in the blank space below the setup block using the following table:
| Blank ID | Length (in) | Width (in) | Thickness (in) | Meets Tolerance |
|---|---|---|---|---|
| 1 | 6.002 | 4.001 | 1.003 | Yes |
| 2 | 5.998 | 4.002 | 1.001 | Yes |
| 3 | 6.001 | 3.999 | 0.999 | Yes |
| 4 | 5.999 | 4.000 | 1.002 | Yes |
All tested blanks meet the required tolerance, so you mark the material verification line in the setup block as confirmed.
Dry run pass parameter review
You set the mill to dry run mode, disabling coolant flow and setting the feed rate to 25% of production speed so you can watch the tool path closely for collisions or unexpected movement. You run the first half of the program first, confirming the tool clears the vice jaws by at least 1/8 inch on all cross cuts, never dips below the stock surface when moving between cut paths, and engages the stop pin only when the spindle is fully stopped. You then run the full program twice more, paying close attention to the through-hole drilling sequence to confirm the drill retracts fully before moving to the next hole location, and the chamfer tool only engages the part edge at the programmed 0.01 inch depth. No unexpected movement or collision risks appear during any of the dry runs, so you note that confirmation next to the dry run line in the setup block.
Scrap risk mitigation signoff prerequisites
Before you add your initial to the approval line, you run through a final set of checks to reduce risk of scrap or machine damage during the run. You confirm the correct part program number is loaded in the mill control, matching the 7-digit number printed in the setup block, to avoid running the wrong cut path for this lot. You test the coolant mix with a refractometer to confirm it sits at the 8% oil concentration noted for aluminum cuts, which prevents chip welding on the end mill that can cause rough finishes or broken tools. You check that the chip bin under the mill is empty, so it does not overflow mid-run and cause an unexpected shutdown that can lead to dimensional errors on partially cut parts. You also confirm the first-part inspection checklist is tucked into the back of the lot packet, so you can fill it out immediately after the first part comes off the machine to catch any setup errors before you run the full lot.
Next time you pull this lot sheet for part runs
When you return to run the second half of this lot tomorrow, you first flip to this setup block to confirm your initial is present, so you only need to re-run a small subset of checks instead of the full setup review. You jot a small note in the margin of the block now, noting that the 3/8 inch carbide end mill has 0.12 inches of usable wear left before it needs replacement, so you do not have to measure its wear again when you start the next run. You add your initial to the setup approval line now, dating it and writing the current time next to it, so anyone who accesses this sheet later knows exactly when the setup was validated. You tuck the sheet back into the lot packet, set it next to the mill control, and unlock the spindle to start the first run of parts, knowing all checks are complete and the setup is configured to produce parts within spec for the full lot. You also add a small sticky note to the front of the packet reminding you to check the end mill wear after the 8th part is cut, so you catch any dulling before it causes dimensional drift that leads to scrap.